BP P-5 Double Ended Substation

Location:

Blaine, WA

Project Overview:

This development in the BP Cherry Point Refinery included the design and construction of a P-5 double ended substation building and associated subsurface electrical duct banks. Substantial excavation and utility installation was necessary for this construction.

Services Provided:

GeoTest provided environmental consulting and sampling services throughout the early phases of this project. Environmental soil sampling was provided during alignment and excavation of the planneed utilities to establish disposal characterization for the existing soils.

Owner:

BP West Coast Products

Project Cost:

$20 Million

Additional Services Provided:

Geotechnical Engineering

Contact Geotest

Geotest welcomes the opportunity to become a part of your team and build the success of your company. We provide Construction Special Inspection and Materials Testing Services throughout Northwest Washington. Our Geotechnical Engineering Department and Environmental team can provide services in Washington State and Oregon.

  • This field is for validation purposes and should be left unchanged.