Analytical Soil Sampling investigation for the stockpiled material.
This development in the BP Cherry Point Refinery included the design and construction of a P-5 double ended substation building and associated subsurface electrical duct banks.
This project included the replacement of a 24,000 foot petroleum pipeline at the Naval Air Station Whidbey Island.
This project was part of the federally funded Cascade High-Speed Capital Program that includes 20 projects across Washington.This program included modifications of existing rail safety and signal systems, as well as improvement of existing track quality.
This was a design-bid-build project to construct facilities that supported the addition of 24 new P-8A Poseidon aircrafts.
This project involves the construction of a new retirement community in Skagit County.
This project included the new construction of a 65,000 sq foot hangar and two-story administrative building.