Subsurface soil and groundwater geotechnical evaluation. Estimations for long-term infiltration rates and stormwater treatment determinations.
Exploration of shallow subsurface, soil, and groundwater conditions. Consultation for foundation support, lateral earth pressures, and seismic design.
Subsurface evaluations of the northwest quadrant of the Lake Whatcom watershed were commissioned by Whatcom County in 2016.
This project included the development of two new water tanks in the area adjacent to the existing clean diesel unit.
This project included the development of a cold storage facility and securing additional property for future expansion.
This is a multiphased construction project anticipated to last at least 3 years. Design began in 2018 and school operations will continue throughout all phases of construction.
Since 2008, the Stillaguamish Tribe has continued to expand and upgrade the Angel of the Winds Casino and facilities.
This project consisted of the stabilization of the upper and lower slope of Bow Hill Road between Darrk Lane and Old Highway 99.
This project was part of a two-phased design-build procurement process.
This project involved the construction of a YMCA for the Stanwood-Camano community.