Location:
Oak Harbor, WA
Project Overview:
This project included the replacement of a 24,000 foot petroleum pipeline at the Naval Air Station Whidbey Island. The P-188 replacement pipline supplies petroleum products between the Seaplane Base and Ault Field.
Services Provided:
GeoTest provided environmental testing and consulting during the planning phases of this project. Push probes were utilized to collect soil samples for analytical testing. Soil test results were used to delineate contaminated soils and disposal characterization along the alignment.
Owner:
US Navy
Project Cost:
$10 Million